Bradfords lane road closure
As part of the second phase of UK power networks installation of underground cables, Bradfords Lane will be closed from the 10th August for 12 weeks.
Access for residents will be maintained at all times.
Planned works
The first section to be closed will be between the entrance of the solar farm and Bradfords Farm, followed by the closure of further sections between the access points below:
- Bradfords Farm
- Bradfords Cottages
- Totes Farm
- Iron Pear Tree
- A22
Contact
The contractor carrying out the works will be Kier. If residents have any issues with access during the work please contact the site manager Stuart Bailey on 07860 852388 and feel free to contact the Parish meeting at littlehorstedclerk@gmail.com.
1 Comment
Is the road actually closed from the A26 (where the road closed sign is)? I would like to use Bradfords Lane to get to Ringmer and would have no need to go near the solar farm